API-1169 Exam Question 36
EPA - Phase for containment counter measures cleanup and disposal.
API-1169 Exam Question 37
All pipe installed off shore, except in Gulf of Mexico, between 12ft and 200 feet must be installed so that the top is __________.
API-1169 Exam Question 38
The company installing a utility will ID areas within _______ ft of existing facilities where blasting will take place
API-1169 Exam Question 39
Inspecting and ensuring the maintenance of temporary erosion control
measures at least:
a. on a _______ basis in areas of active construction or equipment
operation;
b. on a ________ basis in areas with no construction or equipment
operation; and
c. within _________ of each 0.5 inch of rainfall
measures at least:
a. on a _______ basis in areas of active construction or equipment
operation;
b. on a ________ basis in areas with no construction or equipment
operation; and
c. within _________ of each 0.5 inch of rainfall
API-1169 Exam Question 40
When there is a possibility of hazardous exposure to radiant energy, how far back must the head area be protected?
