300-610 Exam Question 121

Refer to the exhibit A Cisco engineer is configuring Cisco Nexus 7000 Series Switches. To simplify initial configuration verification and vPC+/HSRP troubleshooting, the engineer configures the primary vPC+ peer device with the FHRP active router highest priority. The primary FHRP device responds to ARP requests, even though the secondary vPC+ device also forwards the data traffic. Which configuration enables the Layer
3 connectivity from each vPC* peer device?
  • 300-610 Exam Question 122

    An ACI deployment must:
    Which VRF configuration must be used?
  • 300-610 Exam Question 123

    A network architect needs secure access to the organization's perimeter routers and firewalls. The administrator must access network devices from a remote location that is reachable from the WAN cloud Which action meets these requirements?
  • 300-610 Exam Question 124

    An engineer must design a secondary site to prevent a catastrophic primary site failure. The applications must communicate across sites via the data link layer of the OSI model. The Layer 3 transport that is available for this solution consists of 10-Gb connections over Layer 3.
    Which two solutions meet these requirements? (Choose two.)
  • 300-610 Exam Question 125

    To help automate the vHBA configuration process, a network engineer is configuring vHBA template pairs on UCS The engineer is creating primary and secondary templates to define how vHBAs on a server connect to the SAN. Which fact about the template pair should the engineer consider for Its potential impact on service7