D-PE-OE-23 Exam Question 1

A server has two 1100w power supplies. The system needs to enable or disable power supplies dynamically depending on power needs. Power Supply 2 needs to be main power supply.
Which two settings should the technician change? (Choose two.)
  • D-PE-OE-23 Exam Question 2

    A technician creates two virtual disks and assigns a dedicated hot spare to each virtual disk. The technician also creates a global hot spare. A drive fails on the second virtual disk.
    What is the result?
  • D-PE-OE-23 Exam Question 3

    A technician is using the default installation of iSM.
    Where can they find the replicated LC logs using the Windows Event Viewer?
  • D-PE-OE-23 Exam Question 4

    Which component of the Dell EMC PowerEdge 13G server can be used as an indicator to locate a specific system within a rack?
  • D-PE-OE-23 Exam Question 5

    A technician needs to replace a server component with orange tabs/releases.
    Which two steps should the technician take to complete this task? (Choose two.)