Online Access Free DES-1111 Exam Questions
Exam Code: | DES-1111 |
Exam Name: | Specialist - Technology Architect, PowerMax and VMAX All Flash Solutions Exam |
Certification Provider: | EMC |
Free Question Number: | 60 |
Posted: | Sep 11, 2025 |
A data migration is being planned from a Hitachi to a PowerMax using Open Replicator. Which flag is used to protect against SAN failure?
An architect is configuring BCSD to design SRDF/S between two new PowerMax arrays. The architect has completed the tasks for the local side of the solution, including RA Port Group, Replication Group, and site switch.
What is the correct order of steps the architect needs to take to complete the SRDF setup?
Refer to the exhibit.
An SRDF/A solution with BCSD is designed and the results are shown in the exhibit. A customer requirement was a five-minute RPO. In the exhibit shown, the RPO is above the customer requirement.
How can the five-minute RPO requirement be met?