HPE0-J82 Exam Question 31

A Storage Administrator is evaluating a proposed lifecycle management policy for an object storage platform.
Configuration:
Versioning Enabled
Transition Non-Current Versions After 30 Days
Archive Non-Current Versions After 90 Days
Delete Non-Current Versions After 7 Years
Compliance Requirements:
Historical recovery capability
Long-term retention
Reduced storage cost
Which THREE outcomes should be expected? (Choose 3.)
  • HPE0-J82 Exam Question 32

    A customer plans to deploy NVMe-oF connectivity for a new high-performance analytics environment.
    Current Network Infrastructure:
    25Gb Ethernet
    Standard Layer-3 switching
    No DCB
    No PFC
    No planned network upgrades
    Which THREE conclusions are most appropriate? (Choose 3.)
  • HPE0-J82 Exam Question 33

    A Global Manufacturing Enterprise is evaluating a complete storage refresh strategy. The organization currently operates four independent storage arrays supporting:
    SAP HANA Production
    Oracle RAC Databases
    VMware Production Clusters
    VDI Infrastructure
    Assessment Findings:
    Current Peak IOPS: 420,000
    Current Physical Capacity: 520 TB
    Current Logical Capacity: 2.4 PB
    Annual Growth Rate: 28%
    Business Objectives:
    Reduce operational complexity
    Consolidate management tools
    Improve cyber resiliency
    Move from CapEx to OpEx
    Maintain Tier-0 application SLAs
    The proposed solution is HPE GreenLake for Block Storage with HPE Alletra Storage MP.
    Which THREE recommendations best align with the customer's business and technical objectives? (Choose 3.)
  • HPE0-J82 Exam Question 34

    A customer is evaluating HPE GreenLake for File Storage for an AI training platform.
    Application Requirements:
    Linux compute cluster
    15 PB of unstructured training data
    POSIX compliance
    Multi-GB/s throughput per node
    Minimal application modifications
    Which THREE architectural statements are accurate? (Choose 3.)
  • HPE0-J82 Exam Question 35

    A Storage Operations Team receives a predictive capacity alert.
    [InfoSight Capacity Forecast]
    Physical Capacity Used: 440 TB
    Physical Capacity Free: 20 TB
    Forecasted Exhaustion: 18 Days
    Application Growth: 0.8 TB/month
    Snapshot Growth: 22 TB/month
    Recent Configuration Changes:
    Immutable snapshots enabled
    Snapshot retention increased from 14 days to 365 days
    Which THREE conclusions are most appropriate? (Choose 3.)