HPE0-S22 Exam Question 1
An architect reviews an HPE Apollo 6000 design and finds that there are plans for redundant iLO connections on each HPE Apollo 6000 chassis to a pair of top-of-rack switches. These switches are set up as individual switches connected to a single core.
Which configuration change should the architect recommend to ensure a loop free management topology?
Which configuration change should the architect recommend to ensure a loop free management topology?
HPE0-S22 Exam Question 2
A customer has an Ethernet-based storage solution. The customer needs to upgrade its servers to prepare for expanding storage. The customer has spent a lot of money to update its Ethernet infrastructure, so does not want to change it.
The customer has DAS and NAS-based storage and plans to implement a Fibre Channel SAN-based storage array within the next six to eight months.
Which server-based solution meets the customer's future needs?
The customer has DAS and NAS-based storage and plans to implement a Fibre Channel SAN-based storage array within the next six to eight months.
Which server-based solution meets the customer's future needs?
HPE0-S22 Exam Question 3
A customer needs a hosted physical desktop solution. Users will run typical office applications with limited use of some media-rich applications such as Adobe Photoshop. The customer needs the densest and most cost-effective solution that can support such users.
Which HPE Moonshot cartridge should the architect recommend?
Which HPE Moonshot cartridge should the architect recommend?
HPE0-S22 Exam Question 4
An architect is planning an HPE Integrity Superdome X solution with the following nPartitions:
nPar 1= Slots 1, 3, and 5
nPar 2 = Slots 2, 4, and 6
The Superdome X solution must connect to a Fibre Channel SAN solution, which provides boot disks for the Superdome X solution.
The architect has selected a FlexibleLOM adapter for each blade.
What is a valid plan for additional adapters?
nPar 1= Slots 1, 3, and 5
nPar 2 = Slots 2, 4, and 6
The Superdome X solution must connect to a Fibre Channel SAN solution, which provides boot disks for the Superdome X solution.
The architect has selected a FlexibleLOM adapter for each blade.
What is a valid plan for additional adapters?
HPE0-S22 Exam Question 5
A customer needs a hosted physical desktop solution. Users will run typical oice applications with limited use of some media-rich applications such as Adobe Photoshop.
The customer needs the densest and most cost-effective solution that can support such users.
Which HPE Moonshot cartridge should the architect recommend?
The customer needs the densest and most cost-effective solution that can support such users.
Which HPE Moonshot cartridge should the architect recommend?