HPE0-S22 Exam Question 26

An architect needs to determine whether a customer is ready to move to a software-defined data center (SDDC).
Which additional information should the architect obtain from the customer to verify this?
  • HPE0-S22 Exam Question 27

    View the Exhibit.

    Refer to the exhibit. A customer has an HPE c7000 enclosure managed by HPE OneView with HP BL460c Gen9 servers in a vSphere cluster. The customer has multiple vLANs trunked from the top of rack (TOR) switches to the Virtual Connect modules in the enclosure. Due to network Access Control List (ACL) requirement and guidelines from the networking department, all network traffic should be forced to an upstream switch using the Virtual Connect "Private Network" feature.
    The customer reports slow network response.
    Which modification can the architect recommend to improve network performance?
  • HPE0-S22 Exam Question 28

    An architect is planning an HPE Moonshot solution with m710p cartridges. The customer's application requires cartridge nodes to connect to a NAS. The customer's current infrastructure supports 10GbE. In the future, the customer plans to upgrade the fabric between the HPE Moonshot and the NAS solution to support 40GbE.
    Which switch modules and uplink modules should the architect recommend to meet both the current and future needs?
  • HPE0-S22 Exam Question 29

    Which factors must the architect consider to help define an appropriate HPE server solution to meet a customer's needs?
  • HPE0-S22 Exam Question 30

    An architect is proposing an HPE Moonshot System, including m710 cartridges, an iLO
    Chassis Manager, switch, and uplink modules. The customer needs IT staff to be able to access cartridges over a Remote console.
    What should the architect explain to the customer?