When the UPS is parallel, it is necessary to check the input phase sequence of each UPS main bypass, but the output phase sequence is not required.
The NetCol5000-C air conditioner does not support the power module plug and play maintenance.
If the customer load cannot be power-off, what should be taken care when closing the maintenance bypass switch? (Multiple choice)
In the stable operation of the NeCol5000-A35kW air conditioner compressor, the oil level observed by the oil sight is regarded as qualified at the ( ) position.
DOD (depth of discharge) indicates the percentage of battery discharge and battery rated capacity.