H12-425_V2.0-ENU Exam Question 1
The terminal power of the battery in the open circuit state is called ().
H12-425_V2.0-ENU Exam Question 2
The power system of a UPS2000-G-15K at a site is three-phase input and single-phase output. After installation, it is found that the mains and bypass inputs are three-phase, the output is single-phase, and the mains and bypass inputs share a power source. Which of the following statements are true about the UPS wiring mode?
H12-425_V2.0-ENU Exam Question 3
Which of the following cladding scenarios does FusionMoudle2000 support? (Multiple choice)
H12-425_V2.0-ENU Exam Question 4
When the NETCOL5000-A air conditioner is turned on for commissioning, the possible cause of the exhaust high pressure alarm, which is incorrect?
H12-425_V2.0-ENU Exam Question 5
If the customer has high requirements on the availability of the management system and requires that the normal use of the system is not affected by a single point of failure of the hardware, the NetEco management system can provide a high-availability solution of dual-system backup. In the dual-computer solution, what hardware resources are required by NetEco?