Which of the following basic project information doesn't need to be entered manually before configuration quotation? ()
The maximum output power factor of the UPS5000-E can be (), which support another 11% loads than traditional UPSs.
For the UPS2000-G series (6 kVA to 2D kVA), the main input voltage ranges from 80 V to 280 V, and the input frequency ranges from 40 Hz to 70 Hz. A wide input range effectively reduces the battery switch times, failure probability, and battery charge/discharge times, helping improve the battery life.
The output power factor of the UPS5000-A-400/500K is (), which can be applicable to new IT loads and greatly improve the loading capacity.