Online Access Free 000-106 Exam Questions
| Exam Code: | 000-106 |
| Exam Name: | Power Systems with POWER7 Common Technical Sales Skills - v1 |
| Certification Provider: | IBM |
| Free Question Number: | 115 |
| Posted: | Jul 07, 2026 |
A system is being planned with three production partitions, one each for an IBM i, AIX standard edition, and Power Linux applications. One fibre-channel attached TS3100 tape library will be shared between the partitions for backup.Which solution provides tape library sharing with minimum operator intervention?
Which of the following configuration is valid for expansion drawers on a Power 750 with 2 processor boards installed?
A customer has shut down an LPAR after using DLPAR to add or remove processor and memory resources. When the partition is reactivated, the desired changes are missing.What action, or sequence of actions, will immediately and permanently solve this problem?
A customer is upgrading from a 16-core POWER6 570 with two enclosures to a 16-core Power 770 with only one enclosure. There are 22 PCI-X adapters and 19 PCIe adapters spread across the current CECs and I/O drawers.How many and what kind of drawers are needed to connect these adapters?
An HMC managed Power 720 with two partitions is being planned. One partition is production, the other is a test/development partition. Customer management requires the following:
Redundant LAN hardware for the production partition
Dual LAN interfaces
Automatic failover between the redundant physical LAN ports.
Which of the following meets the customer requirement?