CRISC Exam Question 446

You are the project manager of GFT project. Your project involves the use of electrical motor. It was stated in its specification that if its temperature would increase to 500 degree Fahrenheit the machine will overheat and have to be shut down for 48 hours. If the machine overheats even once it will delay the project's arrival date. So to prevent this you have decided while creating response that if the temperature of the machine reach 450, the machine will be paused for at least an hour so as to normalize its temperature. This temperature of 450 degree is referred to as?
  • CRISC Exam Question 447

    Capability maturity models are the models that are used by the enterprise to rate itself in terms of the least mature level to the most mature level. Which of the following capability maturity levels shows that the enterprise does not recognize the need to consider the risk management or the business impact from IT risk?
  • CRISC Exam Question 448

    A risk owner has identified a risk with high impact and very low likelihood. The potential loss is covered by insurance. Which of the following should the risk practitioner do NEXT?
  • CRISC Exam Question 449

    Which of the following provides the MOST useful information to assess the magnitude of identified deficiencies in the IT control environment?
  • CRISC Exam Question 450

    When determining which control deficiencies are most significant, which of the following would provide the MOST useful information?