Online Access Free CHFM Exam Questions

Exam Code:CHFM
Exam Name:Certified Healthcare Facility Manager (CHFM) certification exam
Certification Provider:Medical Professional
Free Question Number:110
Posted:Sep 10, 2025
Rating
100%

Question 1

During an analysis of a recent fire alarm log, a higher-than-normal incidence of construction-related fire alarm activations is discovered. The following tasks must be performed:
The hospital evaluates actions to confirm that they resulted in improvements.
The hospital takes action when it does not achieve or sustain planned improvements.
The facility manager identifies and prioritizes improvement opportunities.
The hospital takes action on improvement priorities.
What is the most effective procedural sequence?

Question 2

At the end of an 8-hour electrical shutdown, after the maintenance work is completed but before the cabinets are closed up or the system re-energized, a final inspection should be completed by individuals who have

Question 3

A high kW demand on a facility electrical consumption report is noted for a one-hour interval. Consumption is less than normal for the same interval. Which of the following could be the cause?

Question 4

Which of the following methods could be used to reduce the cost of a service contract without reducing the scope of service?
Implement an in-house first response program.
Increase the frequency of house calls.
Finance the cost of the contract.
Extend the length of the contract.

Question 5

A primary-secondary chilled water system typically has variable volume pumping on the

Add Comments

Your email address will not be published. Required fields are marked *

insert code
Type the characters from the picture.