MB-330 Exam Question 126
A company allows negative inventory because they ship outbound orders before receipts are processed for items.
On-hand inventory for an item has the following setup:
* Coverage planning for site, warehouse, and location
* Location A = 10 on hand
* Location B = -11 on hand
* Minimum quantity = 20
* Maximum quantity = 30
Which quantity will be reordered when Planning Optimization is run?
Select only one answer.
On-hand inventory for an item has the following setup:
* Coverage planning for site, warehouse, and location
* Location A = 10 on hand
* Location B = -11 on hand
* Minimum quantity = 20
* Maximum quantity = 30
Which quantity will be reordered when Planning Optimization is run?
Select only one answer.
MB-330 Exam Question 127
A company uses Dynamics 365 Supply Chain Management. The company has two sites at ports of entry, one in Atlanta and one in San Francisco.
Due to supply chain constraints and cost fluctuations, the company must change from one standard cost for all products to two standard cost structures, one for Atlanta and one for San Francisco. A costing manager for each site will manage and approve the costing. The historical costs must be retained for analytical purposes.
Costs are revised annually.
You need to configure the system.
What should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Due to supply chain constraints and cost fluctuations, the company must change from one standard cost for all products to two standard cost structures, one for Atlanta and one for San Francisco. A costing manager for each site will manage and approve the costing. The historical costs must be retained for analytical purposes.
Costs are revised annually.
You need to configure the system.
What should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

MB-330 Exam Question 128
A company uses Dynamics 365 Supply Chain Management for inventory management in a single warehouse.
The warehouse is experiencing vendor supply issues with several specific groups of products. The demand and supply for products needs to be viewed for the warehouse using a master planning model for different periods of time.
You need to view the information in a single location.
Which configuration should you use for each requirement?
To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

The warehouse is experiencing vendor supply issues with several specific groups of products. The demand and supply for products needs to be viewed for the warehouse using a master planning model for different periods of time.
You need to view the information in a single location.
Which configuration should you use for each requirement?
To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

MB-330 Exam Question 129
You are a functional consultant for a company named Contoso Entertainment System USA (USMF).
You need to regenerate a master plan named DynPlan for item number D0023.
To complete this task, sign in to Dynamics 365 portal.
You need to regenerate a master plan named DynPlan for item number D0023.
To complete this task, sign in to Dynamics 365 portal.
MB-330 Exam Question 130
A company uses Dynamics 365 Supply Chain Management. The company uses a Business Unit financial dimension. The dimension is required on items and posted on transactions.
The company wants to update item costs but exclude the required financial dimension. The change must include a warning to users before the update. The costing method should be calculated based on the expected, calculated cost to produce an item.
You must configure the system to meet the requirements.
Which actions should you perform? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

The company wants to update item costs but exclude the required financial dimension. The change must include a warning to users before the update. The costing method should be calculated based on the expected, calculated cost to produce an item.
You must configure the system to meet the requirements.
Which actions should you perform? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.