MB-330 Exam Question 131
A company plans to create a product that contains multiple bill of materials (BOM) levels. The product has several components that have both constant and variable costs.
You need to calculate the planned cost for producing the product with manufacturing volumes.
Which explosion mode should you select?
Select only one answer.
You need to calculate the planned cost for producing the product with manufacturing volumes.
Which explosion mode should you select?
Select only one answer.
MB-330 Exam Question 132
A company uses Planning Optimization. The company sets up working day calendars to exclude weekends from lead time calculations.
You configure lead times and safety margins. The system does not use the safety margins in calculations.
You need to ensure that Planning Optimization uses safety margins.
What should you do?
Select only one answer.
You configure lead times and safety margins. The system does not use the safety margins in calculations.
You need to ensure that Planning Optimization uses safety margins.
What should you do?
Select only one answer.
MB-330 Exam Question 133
A manufacturing company uses Dynamics 365 Supply Chain Management.
You must update the safety stock level for raw materials.
You need to calculate and process minimum coverage proposals based on data from historical transactions.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

You must update the safety stock level for raw materials.
You need to calculate and process minimum coverage proposals based on data from historical transactions.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

MB-330 Exam Question 134
A manufacturing company uses standard costs for raw materials.
The company opens a new manufacturing location that will have different standard costs for the raw materials.
The differences in costs must be reflected on the finished goods.
You need to configure the site setup for the different costs.
Which two configurations can be set up?
Select all answers that apply.
The company opens a new manufacturing location that will have different standard costs for the raw materials.
The differences in costs must be reflected on the finished goods.
You need to configure the site setup for the different costs.
Which two configurations can be set up?
Select all answers that apply.
MB-330 Exam Question 135
You need to set up financial components for the new items.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.