Question 1

You are configuring Dynamics 365 Supply Chain Management to optimize production processes.
The current production process involves a job reporting system that is difficult for shop floor workers to use.
This causes delays and mistakes with respect to progress updates, which slows down the organization s overall production You need to improve the efficiency of the production process by implementing a more user-friendly job reporting system for shop floor workers Solution: Select Permanent teams to save the pilot and assistant roles as interchangeable roles for team management.
Does the solution meet the goal?

Question 2

You are the product design manager for a computer manufacturer.
Your new laptop model is configurable. There are restrictions on which hardware components can be selected depending on the model. You create configuration groups for hardware and software.
You need to create a new laptop item number and configurations.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.

Question 3

A company uses the asset management module in Dynamics 365 Supply Chain Management.
A machine on the shop floor is noisy and emitting and odd smell. The shop floor manager must alert the repair team that the asset might require a repair, or a series of repairs, by one or more specialized repair technicians. All repair records must tie back to the initial investigation records in case of a safety audit.
You need to create components to initiate the process of tracking the requests.
Which three actions should you perform in sequence? To answer. More the appropriate actions from the list of actions to the answer to the answer area and arrange them in the correct order.

Question 4

You are the production scheduler at a manufacturing company. The company is not using advanced warehousing. You have firmed a planned production order from master planning. The order is ready to be processed. You now need to process the order in production control. What should you do first?

Question 5

A company uses Dynamics 365 Supply Cham Management.
Several production orders are in the started status.
An issue with equipment causes a rollback in the production status tor some of the orders.
Some orders must be reset once the equipment is repaired, based on which products were being manufactured.
You need to reset the production orders based on the requirements
Which status should you use for each requirement? To answer, drag the appropriate statuses to the correct requirements. Each status may be used once, more than once, or not at all.
You may need to drag the split bar between panes or scroll to view content.