A contractor has hired a subcontractor to construct a parking lot for 60 cars. The parking lot will be 60 feet x
270 feet. The subcontractor has quoted a price of $13.25 per square yard to the contractor.
If the contractor adds a mark-up of 15%, what is the cost of each parking space?
An architect is evaluating a change order.
Where should the costs for the project superintendent or general foreman be included?
An architect is performing a schematic design quality control review for a new mid-rise office tower.
Which drawings will be included in the architect's review?
An architect is working on a design-build project for a large skyscraper. The architect has completed a conceptual design, finalized the contracts, and hired consultants. The schematic design phase is set to begin in one week.
Which items or tasks are important for the architect to complete during this time? Check the three that apply.