Online Access Free NCM-MCI-5.15 Exam Questions
Exam Code: | NCM-MCI-5.15 |
Exam Name: | Nutanix Certified Master - Multicloud Infrastructure (NCM-MCI) 5.15 |
Certification Provider: | Nutanix |
Free Question Number: | 108 |
Posted: | Sep 10, 2025 |
A VM does not have enough resources for the demand, which leads to performance bottlenecks. The VM is exhibiting one or more of following baseline values, based on the past 30 days:
* CPU usage > 90% (moderate), 95% (high)
* CPU ready time > 5%, 10%
* Memory usage > 90%, 95%
* Memory swap rate > 0 Kbps (no moderate value)
Which type of VM is being described?
An organization is running a Nutanix Cluster based on AOS 5.10.x and VMware vSphere 6.7. Currently, the CVM network is segmented and Storage only nodes not present.
A new security project based on NSX is coming. VMware Distributed Virtual Switches are required. The administrator needs to prepare the environment for the new project.
Which step should the administrator use to initiate the project?
A customer has a four-node cluster and is using Volume Groups to provide storage services to a SQL cluster.
In the event of a CVM failure in the cluster, what is the expected IO path of the volume group's iSCSI targets?
An administrator needs to deploy an application with a large amount of data connected via Nutanix Volumes.
Which two actions should the administrator take when designing the Volume Group? (Choose two.)