NCS-Core Exam Question 86
An administrator is planning to deploy a Nutanix cluster to support a few high-performance VMs. This deployment will have the following considerations:
* Individual VMs will likely generate network throughputs in the range of 90-100Mbps
* Due to the configuration of the VMs, it is unlikely that a node will host more than one or two of them at a time
* Individual VMs will communicate with only a few (one or two) remote hosts at a time
* Multicast will not be used in the environment
* The hosts are connected via two 1GbE network connections
How should the administrator configure the network bonds to meet this requirement while maintaining the simplest switch configuration?
* Individual VMs will likely generate network throughputs in the range of 90-100Mbps
* Due to the configuration of the VMs, it is unlikely that a node will host more than one or two of them at a time
* Individual VMs will communicate with only a few (one or two) remote hosts at a time
* Multicast will not be used in the environment
* The hosts are connected via two 1GbE network connections
How should the administrator configure the network bonds to meet this requirement while maintaining the simplest switch configuration?
NCS-Core Exam Question 87
After imaging the nodes and creating the cluster successfully, the consultant connects the cluster to the customer network. When logging into Prism, the events dashboard is full of errors.
What is causing the issue?
What is causing the issue?
NCS-Core Exam Question 88
An organization is running a Nutanix Cluster based on AOS 5.10.x and VMware vSphere 6.7. Currently, the CVM network is segmented and Storage only nodes not present.
A new security project based on NSX is coming. VMware Distributed Virtual Switches are required. The administrator needs to prepare the environment for the new project.
Which step should the administrator use to initiate the project?
A new security project based on NSX is coming. VMware Distributed Virtual Switches are required. The administrator needs to prepare the environment for the new project.
Which step should the administrator use to initiate the project?
NCS-Core Exam Question 89
While preparing for a new four-node cluster installation, the consultant has a Tech Review Call with the customer. The hardware is as follows:
* 4 nodes in 1 Block
* 8 x 10 GbE Ports
* 4 x 1 GbE IPMI Ports
* Adequate Ethernet ports are available
* Ethernet cables are correct and available
* Adequate rack space is available
Which remaining item must be confirmed as available onsite?
* 4 nodes in 1 Block
* 8 x 10 GbE Ports
* 4 x 1 GbE IPMI Ports
* Adequate Ethernet ports are available
* Ethernet cables are correct and available
* Adequate rack space is available
Which remaining item must be confirmed as available onsite?
NCS-Core Exam Question 90
An administrator is using Nutanix Move to migrate aWindows VM from ESXi to AHV. Automated guest preparation is failing with an error:
Account has UAC enabled error
The administrator is using the local built-in administrator account for the Windows VM Admin approval mode must remain enabled.
What should theadministrator do to continue with the migration with Nutanix Move?
Account has UAC enabled error
The administrator is using the local built-in administrator account for the Windows VM Admin approval mode must remain enabled.
What should theadministrator do to continue with the migration with Nutanix Move?