NCSE-Core Exam Question 21

When creating a multi-cluster scenario in Sizer, what does the Summary Failover Capacity indicator (N +0, N
+1) display?
  • NCSE-Core Exam Question 22

    Which functionality allows workloads to continue to run on the host when as AOS upgrade occurs?
  • NCSE-Core Exam Question 23

    A prospective customer wants to refresh their current on premises infrastructure that consists of 4 ESXi hostseach with 20 cores and 512GB of RAM and 1.2PB of usable SAN storage. They have recently renewed their ESXi licensing, and all data must remain within the physical network.
    They are concerned that a hyperconverged solution will not meet their storage requirements without requiring a significant increase in the number of required ESXi hosts and licenses.
    Which Nutanix capability should the systems engineer review with the customer?
  • NCSE-Core Exam Question 24

    A prospective customer wants to migrate database workloads to Nutanix. They are currently running these workloads on a 3 tier Sphere architecture made up of 5 hosts connected to a hybrid SAN over 10G iSCSi. The hosts each have 256G RAM and 2 Broadwell 28 Ghz 12 core processors. The largest database VM is configured with 646 of memory. Some databases are fairly old and single threaded Current performance is deemed acceptable.
    Which configuration component is most important to maintain the customer experience on a new Nutanix cluster and minimize costs?
  • NCSE-Core Exam Question 25

    When using Nutanix Sizer, which solution does the Automatic sizing option provide?