1Z0-902 Exam Question 71
Examine these commands:
1. Execute "crscti stop cluster -all" as the grid user from one database server.
2. Execute "crscti stop cluster -all" as root from one database server.
3. Power off all network switches.
4. Execute "crscti stop cluster" as root from one database server.
5. Execute "crscti stop cluster" as the grid user from one database server.
6. Power off the rack using the power switches on the PDUs.
7. Execute "shutdown -h now" on all database servers.
8. Execute "shutdown -h now" on all Exadata storage servers.
Which is the correct order or the required commands to completely power off an Exadata Database Machine in an orderly fashion?
1. Execute "crscti stop cluster -all" as the grid user from one database server.
2. Execute "crscti stop cluster -all" as root from one database server.
3. Power off all network switches.
4. Execute "crscti stop cluster" as root from one database server.
5. Execute "crscti stop cluster" as the grid user from one database server.
6. Power off the rack using the power switches on the PDUs.
7. Execute "shutdown -h now" on all database servers.
8. Execute "shutdown -h now" on all Exadata storage servers.
Which is the correct order or the required commands to completely power off an Exadata Database Machine in an orderly fashion?
1Z0-902 Exam Question 72
You want to monitor how a large production table is accessed. Especially, you are interested to see how the access on that particular table leverages the benefits of the Exadata Platform.
Which two actions are NOT appropriate for that purpose?
Which two actions are NOT appropriate for that purpose?
1Z0-902 Exam Question 73
What are two recommended configuration best practices for backup and recovery on Exadata?
1Z0-902 Exam Question 74
You are providing oversight for the delivery of a new Exadata Database Machine.
1. Stabilize the Exadata Rack.
2. Unpack Oracle Exadata Rack.
3. Review the safety guidelines.
4. Let the Exadata acclimatize for 24 hours.
5. Power on Exadata PDU A.
6. Place Exadata in its allocated space.
7. Power on Exadata PDU B.
What is the correct order of these steps?
1. Stabilize the Exadata Rack.
2. Unpack Oracle Exadata Rack.
3. Review the safety guidelines.
4. Let the Exadata acclimatize for 24 hours.
5. Power on Exadata PDU A.
6. Place Exadata in its allocated space.
7. Power on Exadata PDU B.
What is the correct order of these steps?
1Z0-902 Exam Question 75
You have a script with several CELLCLI commands that must be executed on each cell in your Exadata full rack. The script must run on each cell simultaneously. How must you achieve this?