1Z0-902 Exam Question 76

What is the minimum Exadata System Software version required for Exadata X9M?
  • 1Z0-902 Exam Question 77

    You have been notified by your Network Administrator that an upstream switch has been replaced due to a hardware fault. Which command verifies that the client network on your Exadata X9M-2 Database Server is available via both client switches?
  • 1Z0-902 Exam Question 78

    You have been asked to investigate why an Exadata Database Server stopped communicating on the client network for 10 minutes over the past weekend.
    Which command would help investigate this?
  • 1Z0-902 Exam Question 79

    Which of the following is NOT a requirement when validating, receiving, unpacking, and planning access route and space requirements for Exadata Database Machine?
  • 1Z0-902 Exam Question 80

    You have been asked to design a backup solution for an Exadata X9M-2 Quarter Rack with Extreme Flash Storage Servers connected to a new ZFS Storage Appliance ZS7 with 2 Storage Controllers with 100Gb Ethernet cards and 3 Storage Trays. You are using Oracle Exadata Configuration Assistant to validate the rack layout.
    1. Use "Add Equipment" to add the Exadata X9M EF Storage Servers, starting from RU10.
    2. Use drop down to add ZFS Storage Appliance Controllers.
    3. You cannot add ZFS Storage Appliance to an Exadata Rack.
    4. Use "Add Equipment" to add the ZFS Storage Trays, starting from RU1.
    5. Use drop down to add ZFS Storage Trays.
    6. Use "Add Equipment" to add the Exadata X9M Database Servers, starting from RU16.
    7. Use "Add Equipment" to add the Exadata X9M EF Storage Servers, starting from RU1.
    8. Use drop down to add Exadata X9M EF Storage Servers.
    9. Use "Add Equipment" to add the ZFS Storage Controllers, starting from RU27.
    10. Use drop down to add Exadata X9M Database Servers.
    11. Use "Add Equipment" to add the ZFS Storage Trays, starting from RU31.
    Which of these steps are correct and what is their correct order?