Online Access Free C-DBADM-2601 Exam Questions
| Exam Code: | C-DBADM-2601 |
| Exam Name: | SAP Certified - Database Administrator - SAP HANA |
| Certification Provider: | SAP |
| Free Question Number: | 217 |
| Posted: | Sep 05, 2026 |
A regional telecom support center performs a planned parameter adjustment for SAP HANA administration. After the change, SAP HANA starts normally and the database remains available. However, an administrator reviewing active settings notices that the parameter appears in the persisted configuration record but is not reflected in the active runtime state used by current sessions. Routine application checks still succeed, so the service desk wants to close the activity.
The constraint is that the administrator must prove that the approved configuration is active, not only stored. The environment must remain available, and any follow-up action must target the configuration activation gap rather than unrelated application behavior.
Which action best resolves the configuration validation issue?
A subscription services provider operates SAP HANA in a mixed environment. After a planned configuration adjustment intended to improve throughput, administrators observe that nightly batch processing finishes on time, but interactive analyst queries now show intermittent delays. Monitoring shows no broad system outage, and memory consumption remains stable. CPU peaks occur only during specific interactive workload windows.
The platform owner wants a correction that preserves the batch improvement while avoiding a broad reversal of the recent tuning changes. The team must decide based on actual workload behavior rather than a general assumption that the entire configuration set should be rolled back.
What is the best next step?
A regional subscription meal company runs SAP HANA for delivery forecast analytics. SAP HANA cockpit shows normal database availability, but the operations team sees that a memory consumption graph has a gap during the nightly planning run. The alert log has no critical entry, yet planners reported slower dashboard response during that same interval. A support coordinator suggests lowering the memory alert threshold to catch the next occurrence.
The constraint is that the administrator must restore trustworthy monitoring evidence before changing alert sensitivity. The next planning run must allow the team to correlate workload behavior with memory evidence.
Which action best addresses the monitoring gap?
CHALLENGE 1 - Supplier Allocation Readiness for Shared Material Demand
A plant buyer argues that urgent materials should allow local supplier substitution whenever the expected allocation pattern does not appear quickly enough during rehearsal. The cutover office is concerned that this approach will create unpredictable post-go-live support demands. Which decision is most appropriate?
A regional paper packaging manufacturer is preparing an SAP HANA upgrade validation for an on-premises administration environment. The upgrade task completed, and SAP HANA cockpit shows the database as available. During validation, the administrator finds that the operations note records the new target level, but the lifecycle evidence file still contains the pre-upgrade component reference from the maintenance rehearsal. The plant reporting team asks to release the system because scheduled analytics are running.
The constraint is that the administrator must prove the upgraded lifecycle state before release. The decision cannot depend only on database availability or successful report execution when lifecycle evidence still reflects the earlier state.
Which action best supports release approval?