Online Access Free C-TSCM42-65 Exam Questions
| Exam Code: | C-TSCM42-65 |
| Exam Name: | SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP5 |
| Certification Provider: | SAP |
| Free Question Number: | 80 |
| Posted: | Sep 26, 2026 |
Which of the following statements regarding ATP checks in SAP ECC that are triggered from customer orders is correct?
An enterprise based in the US produces an end product that is used with the unit of measure "pound" (LB). The material is now to be marketed in the EU. A prerequisite for this is that the material can be sold with the unit "kilogram" (KG).
What is the easiest way to fulfill this requirement?
Which of the following statements about ATP (Available To Promise) checks for material components are correct? (Choose two)
You want to plan a finished material using material requirements planning in an SAP ECC system. The resulting planned orders should be scheduled using basic date scheduling (not lead-time scheduling).
Which of the following statements is true for the resulting dependent requirements?