Online Access Free C_DBADM_2601 Exam Questions
| Exam Code: | C_DBADM_2601 |
| Exam Name: | SAP Certified - Database Administrator - SAP HANA |
| Certification Provider: | SAP |
| Free Question Number: | 217 |
| Posted: | Oct 20, 2026 |
CHALLENGE 2 - Simulation Monitoring Baseline Control
The reporting team asks to apply memory-related tuning before the next baggage-volume simulation because response times varied during the first SIT cycle. The current monitoring baseline has not been fully captured. What should the database owner do first?
A packaged foods company is preparing a controlled maintenance cycle for its on-premises SAP HANA environment while keeping a separate SAP HANA Cloud database available for downstream reporting. The initial upgrade preparation completed, but the final readiness review shows that one administration path still reflects pre-maintenance behavior while the main lifecycle checks show the target state for most components. No broad outage is visible, yet the validation team cannot sign off because the operational view is inconsistent.
The maintenance coordinator wants to avoid unnecessary rollback and complete only the correction needed to restore lifecycle consistency before the business window opens.
Which action is the best choice?
CHALLENGE 2 - Restoration Simulation Monitoring Baseline
The UAT team has two viable actions: tune memory-related settings now to improve restoration analytics, or preserve monitoring evidence first and tune only if current evidence supports it. Which option best balances performance and evidence quality?
CHALLENGE 2 - Dispatch Simulation Monitoring Baseline
Overnight dispatch simulation reports showed variable response time, and the transportation operations lead requests tuning before the final readiness review. The monitoring baseline has not been fully captured, and some thresholds still reflect the pre-cutover reporting pattern. What should the database owner do first?
A regional pharmacy network runs SAP HANA for internal inventory analytics in an on-premises environment that is administered through mixed tooling. After a planned configuration update, the database starts successfully and SAP HANA cockpit shows the system as available. However, an administrative connection test through hdbsql fails from the operations workstation, while the same user can view the system in the cockpit. The connection entry was recently changed during the maintenance activity.
The constraint is that the administrator must restore validated administrative execution without assuming that cockpit visibility proves command-line connectivity. The operations team needs a confirmed administration path before approving the next scheduled monitoring cycle.
Which action best resolves the administrative validation gap?