The company that you advise does not want to manage certain value-intensive materials in the warehouse stock. Instead, the user wishes to control material provision in such a way that these materials are procured directly for the production and/or process order.
How can you fulfill this request? (Choose two.)
Which of the following activities is necessary for the capacity availability check to be carried out automatically when a production order is released?
A final assembly process takes place at three work centers, one after the other. The routing, which consists of three associated operations (10, 20 and 30), plans for a specific BOM component to be installed during operation 30 and not before. The component should therefore only be requested at the start of operation 30.
What sequence do you follow in master data maintenance in SAP ECC to make this component available in line with operations during final assembly?
The company you advise wants to carry out the material availability check automatically in the production order at various points in time. Which of the following options would you recommend? (Choose two.)
In SAP ECC, a customer tests the firming options for planned orders. The customer first sets the manual firming date from the stock/requirements list to firm planned orders that shall occur in the short term. In the material master, a rolling planning time horizon with firming type 1 is active. Some planned orders have also been firmed manually already.
Which statement applies for the resultant firming situation?