Online Access Free 2V0-13.25 Exam Questions
| Exam Code: | 2V0-13.25 |
| Exam Name: | VMware Cloud Foundation 9.0 Architect |
| Certification Provider: | VMware |
| Free Question Number: | 100 |
| Posted: | Dec 23, 2025 |
During the design workshop, the customer stated the following requirement:
* The solution will support secure communication.
Which design decision should be included in the logical design for the workload domain?
As part of a design for a VMware Cloud Foundation (VCF) solution, an architect has documented the following dependencies and constraints:
* CONSOOl - Internet access will not be permitted from anywhere within the VCF solution.
* CONS002 - The password must not be stored in plain text anywhere within the VCF solution.
* DEP001 - The customer must make the required VCF binaries accessible to the VCF Installer appliance during the deployment phase.
Which design decision should the architect include in the design for the download of the VCF binaries?
An architect responsible for creating the automation design for a VMware Cloud Foundation (VCF) Private Cloud is reviewing the notes from a customer design workshop. The customer has provided the following information:
* The customer's existing fleet management instance will be upgraded to maintain the existing process for virtual machine deployments.
* The customer would like to limit the total active resource consumption per VCF Automation user.
* The customer would like to ensure requests meet company requirements prior to deployment for certain users.
A combination of which two VCF Automation policies should the architect recommend to meet the customer's stated requirements? (Choose two.)
Requirement: Ensure all management components are redundant at the component level.
Which design quality should classify this requirement?
An architect is designing a Business Continuity Disaster Recovery (BCDR) strategy for a Virtual Cloud Foundation (VCF) environment with a management domain and multiple workload domains deployed in two datacenters located in the same city.
During one of the initial workshops with stakeholders, the following information was identified:
* The Recovery Time Objective (RTO) for workloads is 24 hours.
* The management domain must remain continuously available with Recovery Point Objective (RPO) of
0.
* Hardware overhead should be minimized by utilizing standby resources that host test workloads during normal operation.
* Operational overhead should be minimized.
* Latency between both datacenters is 2 ms.
Which design decision should the architect document to satisfy provided requirements?
Recent Comments (The most recent comments are at the top.)
Thanns
Thanns