CCM Exam Question 26

The procurement process of a project executed based on any FIDIC Contract model is exactly the same in terms of definitions, time and steps, which makes it universal and more easy to use worldwide. Is this statement true or false?
  • CCM Exam Question 27

    Which one of the following documents constitutes a contract and is considered binding on both parties, when the Employer wants to award the Contract to the tenderer?
  • CCM Exam Question 28

    The Employer has prepared a contract for a waste-to-energy project based on the FIDIC Yellow Book (edition
    1999). You are preparing negotiations on behalf of one of the Subcontractors with the Contractor. The main Contractor will manage the design and build of the Works, whereby the Subcontractor will deliver critical systems regarding power generation and cooling. The Contractor intends to contract the main Contract back- to-back with the Subcontractor. In the proposed back-to-back subcontract, the following amendment is proposed through Particular Conditions:
    " Sub-Clause 4.4. The following paragraph is added: The Subcontractor is required to scrutinize the Employer
    ' s Requirements in a manner identical to the obligations of the Contractor as stated in Sub-Clause 5.1 of the Main Contract. The Subcontractor will indemnify and hold harmless (up to the maximum liability of the Subcontractor) the Contractor with regard to any error, fault or other defect found in the Employer ' s Requirements, its items of reference or Contractor ' s design of the Works for the scope part for which Subcontractor is contracted. " What is your advice to the Subcontractor (SC) in regard to entering this proposed subcontract?
  • CCM Exam Question 29

    The FIDIC Red Book (edition 1999) deals with Value Engineering Clause. It follows from this clause that the Contractor shall give notice to the Engineer with supporting particulars. Upon receiving this notice, the Engineer shall proceed in accordance with Sub-Clause 3.5 to agree or determine this Cost, which shall be included in the Contract Price.
  • CCM Exam Question 30

    What are two differences between a notice and other communications under the FIDIC Red Book (edition
    2017)? (2 correct answers apply)
    Choose all of the correct answers (multiple possibilities).