PVIP Exam Question 41
During a PV system inspection, an installer notices that the rapid shutdown system fails to de-energize the array within 30 seconds of initiation. What is the most likely cause based on NEC 690.12 requirements?
PVIP Exam Question 42
What is the maximum allowable voltage drop for a PV source circuit conductor run of 100 feet, using 10 AWG copper wire, if the system operates at 48V DC and the design specifies a 2% voltage drop?
PVIP Exam Question 43
A PV module shows burn marks near the junction box. What is the most likely cause?
PVIP Exam Question 44
A PV connection is being made at the center of a 300 ft. long 200 feeder. See the attack diagram. The feeder originates in the upper third of the 800A main service panel (800A main breaker) with a 200A breaker and terminates in a 200A main-lug-only subpanel. The rated output of the PV system inverter is 100A.

Which are the NIMUMUM actions required to achieve an NEC-compliant installation?

Which are the NIMUMUM actions required to achieve an NEC-compliant installation?
PVIP Exam Question 45
A site survey indicates a residential roof with a 4:12 pitch facing 20° east of south. The local latitude is 35°N, and the optimal tilt for maximum annual production is equal to latitude. What adjustment should be made to compensate for the roof's orientation and tilt to achieve near-optimal output?