PVIP Exam Question 41

During a PV system inspection, an installer notices that the rapid shutdown system fails to de-energize the array within 30 seconds of initiation. What is the most likely cause based on NEC 690.12 requirements?
  • PVIP Exam Question 42

    What is the maximum allowable voltage drop for a PV source circuit conductor run of 100 feet, using 10 AWG copper wire, if the system operates at 48V DC and the design specifies a 2% voltage drop?
  • PVIP Exam Question 43

    A PV module shows burn marks near the junction box. What is the most likely cause?
  • PVIP Exam Question 44

    A PV connection is being made at the center of a 300 ft. long 200 feeder. See the attack diagram. The feeder originates in the upper third of the 800A main service panel (800A main breaker) with a 200A breaker and terminates in a 200A main-lug-only subpanel. The rated output of the PV system inverter is 100A.

    Which are the NIMUMUM actions required to achieve an NEC-compliant installation?
  • PVIP Exam Question 45

    A site survey indicates a residential roof with a 4:12 pitch facing 20° east of south. The local latitude is 35°N, and the optimal tilt for maximum annual production is equal to latitude. What adjustment should be made to compensate for the roof's orientation and tilt to achieve near-optimal output?