NCS-Core Exam Question 136

An administrator needs to forecast infrastructure requirements for a new program and its associated applications. Prior to the projected start of the new program, all existing applications will be decommissioned.
How should the administrator perform this task?
  • NCS-Core Exam Question 137

    The customer notices storage latency issues with their new Nutanix AHW cluster. The deployment includes the following components:
    2 ToR switches
    7 nodes
    Which command should the consultant run to identify issues?
  • NCS-Core Exam Question 138

    A consultant is running Foundation. The cluster creation fails during the process. The host logs confirm that the nodes have been successfully imaged. The consultant decides to create the cluster manually.
    Which command should the consultant use?
  • NCS-Core Exam Question 139

    After a consultant runs Foundation, the imaging process fails.
    In which two locations can the consultant find the logs? (Choose two.)
  • NCS-Core Exam Question 140

    A consultant creates a four-node AHV cluster with two 1GbE (eth0, etc1) and two 10GbE (eth2, eth3) NICs per node. The 1GbE NICs will not be placed into service, but the customer wants the network to be preconfigured for their eventual use.
    The consultant removes the 1GbE NIC from the default bond and creates a second bridge(br1), but is unable to add the 1GbE NIC using the below command:
    manage_ovs -bridge_name br1 -interfaces 1g -bond_name br1-up update_uplinks Which parameter is missing from this command?