LEED-AP-BD-C Exam Question 126

The project team has decided to substitute the flooring in the school gym with natural rubber flooring that has met the Sustainable Agriculture Standard. The cost of the substituted flooring is $80,000. The project will achieve
  • LEED-AP-BD-C Exam Question 127

    What information must be provided to demonstrate compliance with the Owner's Project Requirements (OPR)?
  • LEED-AP-BD-C Exam Question 128

    A project team member has prepared a map and accompanying table as documentation for the Location and Transportation Credit. Surrounding Density and Diverse Uses. Option 2. Diverse Uses. The map includes the location of each diverse use. the location of the project and the main entrance of the building. The table includes the distance to each use. the name of each use and the category of each use The team lead reviews the documentation and notes an important missing item. Which of the following is the most important item to add to the documentation?
  • LEED-AP-BD-C Exam Question 129

    Which of the following project team members should be integrated early into the design phase to assist with earning the Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning?
  • LEED-AP-BD-C Exam Question 130

    A project has total waste of 20 tons (18.1 tonnes) that includes the following:
    * 8 tons (7.3 tonnes) of recycled demolition steel and concrete
    * 2 tons (1.8 tonnes) of trees cleared from the site
    . 3 tons (2.7 tonnes) of commingled scrap with 40% diverted
    . 6 tons (5.4 tonnes) of used furniture donated to a non-profit organization
    * 1 ton (0.9 tonnes) of removed carpet and ceiling tiles sent back to the manufacturer What is the percentage of diverted waste for Materials and Resources Credit, Construction and Demolition Waste Management?