MB-320 Exam Question 81
A pharmaceutical manufacturer uses Process manufacturing.
You are consolidating planned batch orders for a specific medication. The order must cover two weeks of demand. No other items need to be consolidated.
You need to change the coverage group of the items.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

You are consolidating planned batch orders for a specific medication. The order must cover two weeks of demand. No other items need to be consolidated.
You need to change the coverage group of the items.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

MB-320 Exam Question 82
You work for a gem wholesaler that sells raw diamonds. Diamonds are purchased and sold in individual boxes but weighed and inventoried in carats.
You are setting up a catch weight item for diamonds. Each box of diamonds must be tracked by its individual container weight.
You need to set up this item as a full visibility catch weight item.
Which two steps must you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
You are setting up a catch weight item for diamonds. Each box of diamonds must be tracked by its individual container weight.
You need to set up this item as a full visibility catch weight item.
Which two steps must you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
MB-320 Exam Question 83
A company produces custom-made bicycles that offer many different configurations.
Your standard bicycle, B-0001, is made with many common components such as a frame and wheels. Customers can choose between two frames: F-0001 or F-0009. Wheel W-0001 is only compatible with frame F-0001.
You create the following configuration groups: Frames, Wheels
You need to ensure that users can only select valid combinations of frames and wheels.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.

Your standard bicycle, B-0001, is made with many common components such as a frame and wheels. Customers can choose between two frames: F-0001 or F-0009. Wheel W-0001 is only compatible with frame F-0001.
You create the following configuration groups: Frames, Wheels
You need to ensure that users can only select valid combinations of frames and wheels.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.

MB-320 Exam Question 84
A skateboard manufacturer uses route operations to schedule resources and estimate units per hour. All products use the sample sub assembly item and resource sanding process.
You observe an increase in the number of units a sanding belt resource can produce. The production schedule is now inaccurate due to the number of units the sanding belt line can produce.
You must make a permanent change to the number of units the resource can produce for all future orders.
You need to adjust the process quantity on the route operation.
Which three actions should you perform in sequence? To answer, move the appropriate actions form the list of actions to the answer area and arrange them in the correct order.

You observe an increase in the number of units a sanding belt resource can produce. The production schedule is now inaccurate due to the number of units the sanding belt line can produce.
You must make a permanent change to the number of units the resource can produce for all future orders.
You need to adjust the process quantity on the route operation.
Which three actions should you perform in sequence? To answer, move the appropriate actions form the list of actions to the answer area and arrange them in the correct order.

MB-320 Exam Question 85
A company uses Dynamics 365 for Finance and Operations for Process manufacturing.
You are reviewing the planned production orders for the next two weeks. There are several production orders for the same product. One order is scheduled to run the week after another order.
You need to optimize the planned production orders.
What should you do?
You are reviewing the planned production orders for the next two weeks. There are several production orders for the same product. One order is scheduled to run the week after another order.
You need to optimize the planned production orders.
What should you do?